Oven Configuration
Single vs double vs steam combo. Measure cavity dimensions before cabinetry order. Electrical load: 10A (2.4kW) vs 15A (3.6kW) requires different circuits.
Cooktop Selection
Gas: instant heat, wok-friendly. Induction: energy efficient, safe, requires compatible cookware. Ceramic: budget option, slower response. Minimum clearance 50mm sides.
Rangehood Sizing
Match or exceed cooktop width. CFM rating: cooktop BTU รท 100. Ducted outperforms recirculating. Noise: <60dB acceptable. Height above cooktop: 650-750mm.
Dishwasher Integration
Standard 600mm wide. Slimline 450mm (smaller kitchens). Panel-ready models accept custom doors. Plumbing: cold water + drain. Electrical: 10A circuit.
Energy Ratings
Minimum 4-star (ovens, dishwashers). Induction cooktops most efficient. Check Energy Rating Label. Victorian Energy Upgrades rebates sometimes available.
Key Takeaways
- Confirm appliance dimensions before cabinetry
- Induction most energy-efficient cooktop
- Rangehood CFM must match cooktop output
- Panel-ready dishwashers integrate seamlessly
- Minimum 4-star energy rating recommended
Questions Homeowners Usually Ask Next
How much should I budget for a kitchen renovation in Melbourne?
Budget depends on layout changes, cabinetry level, benchtop choice, appliance scope and trade complexity. As a rule, fixed-layout refreshes sit much lower than structural redesigns with new services and premium finishes.
Should I keep the same kitchen layout to control cost?
Usually yes. Retaining the sink, cooktop and major service points helps contain demolition, plumbing and electrical costs. Layout changes only make sense when workflow, storage or family use will materially improve.
What kitchen upgrades usually add the most practical value?
Better drawer storage, smarter appliance placement, durable benchtops, layered task lighting and a well-sized rangehood tend to improve daily use more than cosmetic-only upgrades.
How long does a kitchen renovation usually take?
Most kitchens run over several weeks rather than a few days, especially when cabinetry manufacturing, stone templating and multiple trade visits are involved. Lead times often matter more than the demolition phase.
Use This Article With Related Reading
Connect this advice to the delivery page that matches the renovation scope.
Read adjacent guides in the same decision stage to avoid thin, one-page planning.
Pair planning content with finished renovation visuals before locking scope and finishes.
Ready to Start?
Need appliance selection advice? Get expert consultation.