Minimum Sizing
Island length: 1200mm (functional). Width: 900-1200mm (standard). Clearance around island: 1000mm minimum, 1200mm ideal for high-traffic.
Seating Configuration
Overhang: 300mm for knees. Seat width: 600mm per person. Stool height: 650mm (900mm benchtop), 750mm (1050mm breakfast bar).
Sink Placement
Pros: Faces room, social. Cons: Plumbing complexity, splashback on guests. Requires adequate depth for undermount (min 600mm from edge to wall behind).
Cooktop Placement
Pros: Ventilation easier (downdraft or ceiling hood). Cons: Safety concern with children, hot pots near seating. Requires 300mm clearance from seat edge.
Storage Integration
Deep drawers both sides. Wine fridge, microwave drawer, pull-out bin. Avoid wasted space; plan internal layouts before cabinetry order.
Key Takeaways
- Minimum 1000mm clearance around island
- 300mm overhang needed for seating
- Sink placement adds social function
- Cooktop requires safety clearances
- Maximize storage with deep drawers
Questions Homeowners Usually Ask Next
How much should I budget for a kitchen renovation in Melbourne?
Budget depends on layout changes, cabinetry level, benchtop choice, appliance scope and trade complexity. As a rule, fixed-layout refreshes sit much lower than structural redesigns with new services and premium finishes.
Should I keep the same kitchen layout to control cost?
Usually yes. Retaining the sink, cooktop and major service points helps contain demolition, plumbing and electrical costs. Layout changes only make sense when workflow, storage or family use will materially improve.
What kitchen upgrades usually add the most practical value?
Better drawer storage, smarter appliance placement, durable benchtops, layered task lighting and a well-sized rangehood tend to improve daily use more than cosmetic-only upgrades.
How long does a kitchen renovation usually take?
Most kitchens run over several weeks rather than a few days, especially when cabinetry manufacturing, stone templating and multiple trade visits are involved. Lead times often matter more than the demolition phase.
Use This Article With Related Reading
Connect this advice to the delivery page that matches the renovation scope.
Read adjacent guides in the same decision stage to avoid thin, one-page planning.
Pair planning content with finished renovation visuals before locking scope and finishes.